Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
BATTERY CABLES REPLACEMENT - CONTINUED
0101 00
INSTALLATION - CONTINUED
18
4.
Position shunt (25) onto seat frame. Install shunt with
16,17
19,20
two capscrews (29) and new self-locking nuts (28).
21
22,23,24
1
5.
Connect two wires (27) to shunt (25) with two screws
(26).
12
25
6.
Connect cables (12 and 21) to shunt (25) with two
26
starwashers (24), washers (23) and nuts (22).
15
28
7.
Connect cable (21) to negative post on battery discon-
29
nect switch (18) with starwasher (20) and nut (19).
8.
Install negative battery cable (1) through battery side
and connect to battery disconnect (18) with starwasher
(17) and nut (16).
387-579
13,14
27
9.
Install three clamps (15) with three washers (14) and capscrews (13).
10.
Connect cable (12) to tractor frame with washer (11) and capscrew (10).
NOTE
Capscrews and clamps are located inside bell housing and on frame under seat.
11.
Install two clamps (9) with two capscrews (8).
10,11,12
6
8,9
12.
Install new tiedown straps to secure cables (6 and 7) to
frame.
387-578
7
0101 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business