|
|
TM 5-2410-237-23
RADIATOR MAINTENANCE - CONTINUED
0068 00
INSTALLATION
1.
Install two lifting links (35) with bolts 1/2-13 x 1-1/2 in. in radiator top tank (36).
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in death or injury to
personnel.
CAUTION
Ensure that wiring harness from horn, located between radiator and support, is clear of radiator. Lower
radiator slowly and carefully to avoid damage to wiring harness.
NOTE
Radiator weighs 450 lb (204 kg).
2.
Attach nylon sling and suitable lifting device to lifting links (35) and lift radiator (10) into radiator guard on machine.
NOTE
Do not tighten capscrews until all radiator mounting hardware has been installed.
3.
Install three washers (34) and capscrews (33) at front
bottom of radiator (10).
35
4.
Install bracket (31) at bottom front of radiator (10)
36
with four washers (30) and capscrews (29).
5.
Repeat step 4 for bracket (32) on other side of radiator
(10).
10
6.
Remove lifting device, bolts and two lifting links (35).
31,32
29,30
33,34
387-963
0068 00-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |