|
|
TM 5-2410-237-23
ETHER STARTING AID MAINTENANCE - CONTINUED
0061 00
REMOVAL
1.
Remove ether canister. See Service in this work package.
NOTE
Complete draining of coolant is not required.
2.
Partially drain coolant (WP 0065 00).
3.
Remove tube assembly (7) from valve adapter (8) and cylinder head adapter (9).
4.
Remove adapter (8) and adapter (9).
CAUTION
Cover or plug hole in cylinder head so that dirt cannot enter.
5.
Remove nozzle (10) from cylinder head.
NOTE
Tag wires to ensure correct installation.
6.
Disconnect wire assembly (11) at connectors (12 and 13) and wire assembly (14) at connectors (15 and 16).
7.
Remove two nuts (17), washers (18) and capscrews (19) and remove valve (5).
8.
Remove screw (20) and washer (21) from temperature switch (22).
9.
Remove temperature switch (22).
10.
Remove capscrew (23) from clamp (24) and remove wire assembly (14).
11.
Separate connector (25) from wiring harness.
12.
Remove capscrew (26) from clamp (27) and remove wire assembly (11).
13.
Remove grommet (28).
17
25
18
26
11
27
28 12 13
7
23
24
19
9
8
21
10
5
20
15 16
14
22
387-241
0061 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |