Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
ENGINE ASSEMBLY REPLACEMENT - CONTINUED
0021 00
INSTALLATION - CONTINUED
10.
Position battery cable (46) over flywheel housing and attach clamp to flywheel housing with capscrew (44) and washer
(45).
11.
Position power cable through governor control linkage bracket and attach clip (43) holding cable to bracket.
43
46
387-079
44,45
387-078
12.
Install line (42) on transmission relief valve.
13.
Install two clamps (39) that attach two lines (40 and 41) to torque divider.
14.
Connect two lines (34 and 35) to transmission relief valve using eight capscrews (36), washers (37) and four split
flanges (38).
15.
Connect oil supply line (30) to transmission using two capscrews (31), washers (32) and new O-ring (33).
16.
Connect vent line (26) to torque divider using two capscrews (27), washers (28) and new gasket (29).
17.
Install new O-ring (25). Connect hose assembly (21) to oil cooler tube assembly using four capscrews (22), washers (23)
and two flange halves (24).
TO TRANSMISSION
39 27,28,29
42
41 40
36,37,38
OIL COOLER
34
TO OUTLET
TORQUE
CONVERTER
21
TO TRANSMISSION
35
OIL COOLER
TO
TRANSMISSION
FRONT
26
387-077
31,32,33 30
387-076
22 23 24 25
0021 00-11
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business