Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
OIL FILLER TUBE REPLACEMENT - CONTINUED
0013 00
INSTALLATION
1.
Put cap assembly (9) on tube assembly (4). Align chain, hasp (8) and washer (7) and install new rivet (6).
2.
Clean gasket surface on tube assembly (4) and engine block.
NOTE
Evenly apply gasket forming compound on new gasket before installation.
3.
Install tube assembly (4) with new gasket (5), three washers (3) and capscrews (2).
4.
Install padlock (1) through hasp (8).
4
5
9
8
1
7
6
3
2
387-113
5.
Install transmission oil cooler (WP 0109 00).
6.
Run engine and check for leaks (TM 5-2410-237-10).
END OF WORK PACKAGE
0013 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business