Click here to make tpub.com your Home Page

Page Title: No. 2 Carrier Disassembly and Assembly.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

remove the No. 4 inner planet gears (5) together
1 Planet gear shaft
with the bearings and washers.
2 Ball
NOTE
3 Planet gear shafts
Use care to
avoid loss of the balls (4) and (9) in the
4  Ball
planet gear
shafts (2)anf (8). Two bearings (7) and
5 No. 2 outer planet gear
two washers
(6), one on either side of each planet gear,
6 No. 1 planet gear
are provided
with each planet gear in the carrier.
7 No. 3 planet gear
(4) The No. 4 outer planet gears (10) complete
9 No. 2 inner planet gear
with bearings and washers can be removed after
No. Washer
10
removing the planet gear shafts (8).
(5) Inspect all gears, bearings, washers and
i. No. 2 Carrier Disassembly and Assembly.
s h a f t s in the carrier and replace any that are worn
( 1 ) Position the No. 2 carrier (1, fig. 6-60) as
or damaged.
shown.
(6) Assemble the carrier in the reverse order of
( 2 ) Pull the planet gear shafts (2) part of the
d i s a s s e m b l y making certain the ball is in place in
w a y out of the carrier and remove the No. 5 planet
each planet gear shaft and correctly aligned with
gears (3), washers (6) and bearings (7).
the notch in the carrier.
(3) Pull the shafts (2) from the carrier and
6-53

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business