Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
HYDRAULIC TANK REPLACEMENT - CONTINUED
0166 00
INSTALLATION
CAUTION
Wipe area clean around openings in tank and hydraulic lines before installation, to ensure contamination
does not enter hydraulic system.
1.
If removed, install two lifting links with 1/2 -13 x 1in. bolts in threaded holes (A) in top of hydraulic tank (7).
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death.
NOTE
Hydraulic tank weighs is 248 lb (113 kg).
2.
Attach a nylon sling to lifting links on hydraulic tank (7).
3.
Use nylon sling and lifting device to position hydraulic tank (7) on fender, with mounting holes in tank aligned with
holes in fender.
4.
Secure hydraulic tank (7) to fender with four new lockwashers (25) and capscrews (24).
NOTE
Perform steps 5 and 6 only if machine is equipped with a ripper.
Lightly coat new O-rings with clean oil before installation.
5.
Install new O-rings (21) to ripper cylinder oil lines
20
7
(20).
6.
Install ripper cylinder oil lines (20) to hydraulic tank
21
(7) with four split flanges (19), eight new lockwashers
(HIDDEN)
(18) and capscrews (17).
386-754
19
17,18
21 (HIDDEN)
0166 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business