|
|
TM 5-2410-233-23
TURBOCHARGER ASSEMBLY REPLACEMENT - CONTINUED
0046 00
INSTALLATION
NOTE
If adapter has been removed, perform step 1. If it has not been removed, start installation of
turbocharger at step 2.
Wipe all sealing surfaces clean and dry before installing new seals and gaskets. Apply a light
film of clean lubricating oil to new seals prior to installation.
1.
Install new gasket (15) and adapter (8) on exhaust manifold with four capscrews (14) and nuts (13).
2.
Position new gasket (12) on adapter (8).
3.
Position turbocharger (7) on adapter (8) and insert elbow (11) in output side of turbocharger.
4.
Apply antiseize compound to four capscrews (6).
5.
Align bolt holes in turbocharger (7), gasket (12) and adapter (8). Install four capscrews (6) and nuts (5).
6.
Install capscrew (9) and retainer (10) to elbow (11) and turbocharger (7).
7.
Install two new seals (4) on each end of turbocharger
2
elbow (3) and insert one end of elbow in air cleaner
7
outlet (2).
8.
Insert elbow (3) in turbocharger (7) and install air
cleaner outlet (2) on engine intake pipe (16) with four
capscrews (1).
1
3
16
386-239
9.
Install air cleaner (WP 0043 00).
10.
Install turbocharger oil lines (WP 0048 00).
11.
Install muffler (WP 0058 00)
12.
Crank engine for 10 seconds before starting to pre-lubricate turbocharger.
13.
Run engine and check for proper operation (TM 5-2410-233-10).
END OF WORK PACKAGE
0046 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |