MWO 9-2320-287-35
b. E q u i p m e n t in wholesale depot supply or maintenance activities. All MWO's to
include MWO which have been incorporated into DMWR, will be accomplished on service-
a b l e m a t e r i e l p r i o r t o i s s u e a n d / o r s u b s e q u e n t t o s c h e d u l e d c o m p l e t i o n d a t e . Opera-
tional Project Stock stored at the depots will be modified concurrently with depot
stock.
I s s u e of unmodified materiel is prohibited. The MWO will be applied to
unserviceable materiel during scheduled depot maintenance.
c. Prepositioned stock.
LIMITED URGENT MWO will be applied prior to expiration
of MWO completion date.
3.
END ITEM OR SYSTEM TO BE MODIFIED.
End Item to be Modified
Table 1.
SERIAL NO.
MODEL NO.
RANGE
PART NO.
NSN
NOMENCLATURE
M911
All
N/A
T r u c k , Tractor Heavy
E q u i p m e n t Transporter,
(C-HET) 85,000 GVWR,
8x6, M911
4 . MODULES (COMPONENTS, ASSEMBLIES, SUBASSEMBLIES, BOARDS, AND CARDS) TO BE
MODIFIED.
N o t Applicable.
5.
PART(S) TO BE MODIFIED. Not Applicable.
6.
APPLICATION.
MWO effective date 1 September 1982 and completion
a . Time Compliance Schedule.
date 29 December 1982.
b . L e v e l of Maintenance.
Modification will be accomplished by Direct Support
maintenance level.
c . Applied BY.
T w o persons with the following specialties are required to
i n s t a l l MWO kit.
3 manhours
(MOS 63H)
Automotive Repairman
or
3 manhours
Equivalent Civilian Mechanic
d.
Time Required.
3 manhours using 2 persons.
(1)
Total
of
3 m a n h o u r s downtime for end item.
(2)
Total
of
( 3 ) Time for completion of one tow kit installation is 3 hours.
(4) Time for completion of one part. Not Applicable
2
|