Click here to make tpub.com your Home Page

Page Title: ASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
BLADE TILT AND RIPPER PILOT VALVE ASSEMBLY REPAIR - CONTINUED
0245 22
ASSEMBLY - CONTINUED
9.
Install three new O-rings (12) at large valve ports, new O-rings (13) at smaller ports and two new small O-rings (14) at
smallest ports in inlet manifold (11).
10.
Repeat step 9 to install new O-rings (12, 13 and 14) on ripper pilot valve (9) and blade tilt pilot valve (10).
CAUTION
Ensure all O-rings and seals are properly seated when assembling manifolds and pilot valves. Cut or
pinched O-rings or seals could cause leaks and system malfunctions.
11.
Position and carefully align inlet manifold (11), blade tilt pilot valve (10), ripper pilot valve (9) and outlet manifold (8)
together.
12.
Install three bolts (7) to secure manifolds (8 and 11) and pilot valves (9 and 10).
8
12
14 12
7
14
9
14
10
12
11
387-609
13
Change 1
0245 22-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business