Click here to make tpub.com your Home Page

Page Title: DISASSEMBLY - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
WINCH ASSEMBLY REPAIR - CONTINUED
0245 19
DISASSEMBLY - CONTINUED
Remove Planetary Carrier.
5.
a.
Remove eight capscrews (132) and lockwashers (133) from bearing cover (134) on planetary carrier assembly.
Discard lockwashers.
b.
Install two guide pins in place of two capscrews (132).
c.
Use two 3/8-16NC forcing screws to remove bearing cover (134).
d.
Remove bearing (135) from bearing cover (134).
e.
Remove seal (136) from bearing cover (134). Discard seal.
f.
Remove sight gage (137) from bearing cover (134). Remove seal (138) from sight gage. Discard seal.
g.
Remove drive gear (139) and planetary carrier (140) assembly from shaft (shaft is not visible in illustration).
h.
Remove eight bolts (141) and four plates (142) from bearing cage (143).
i.
Slide ring gear (144) off bearing cage (143) and remove through opening in top of case (5).
j.
Push pin (145) into shaft (146).
k.
Push shaft (146) out of planetary carrier (140).
l.
Remove gear (147), two bearings (148) and two thrust washers (149) from planetary carrier (140).
m.
Remove pin (145) from shaft (146).
n.
Repeat steps (j through m) to remove three remaining gear (147) sets.
o.
Remove bearing race (150) from drive gear (139).
138
134
137
136
133
132
139
135
150
140
141
145
5
146
149
148
147
142
148
149
144
143
421-0218
Change 1
0245 19-14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business