Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
CAMSHAFT AND CAMSHAFT BEARINGS REPLACEMENT - CONTINUED
0245 06
INSTALLATION
NOTE
The bearing joint angle must be within 15 degrees from vertical position (X). The installation depth or
dimension (E) of the front bearing from the front face of the block is 0.02 0.02 in. (0.5 0.5 mm).
1.
Use bearing driver kit to install new front bearing (the bearing with two oil holes) (10) in the cylinder block with the
bearing oil holes in alignment with the oil holes in a horizontal position and with the bearing joint at the top.
NOTE
Install bearings to the dimensions given from the front face of the block: F) 6.06 0.02 in. (153.9 0.5 mm),
G) 11.94 0.02 in. (303.3 0.5 mm), H) 23.69 0.02 in. (601.7 0.5 mm), I) 35.60 0.02 in. (904.2 0.5
mm).
2.
Use bearing driver kit to install the remainder of the new bearings (11) with the bearing oil hole in alignment with the oil
hole in the cylinder block.
X
E
F
G
H
I
421-0138
421-0139
0245 06-5
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business