Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
INSTALLATION OF ARMOR PACKAGE - CONTINUED
0228 00
INSTALLATION - CONTINUED
17.
Installation of Cab Windows.
NOTE
2004 MCAP Armor Kit has larger front and side windows that require four each side frames and
twelve bolts and washers.
Threat side of glass must face to outside of operator area. If glass panel is not labeled, threat side has a
thinner outer panel.
Thread lock sealing compound may be applied to mounting bolts during installation. Bolts will be
torqued at completion of this step.
Window frames must be installed loosely and then tightened corner to corner and side to side to allow
glass panels to center within frame work.
After installation of glass panels and frames, tighten mounting bolts to 50 lb-ft (68 Nm).
a.
Install lower window frame (283) and side frames (284) with five bolts (285) and washers (286).
b.
Place molding (287) around glass (288) and install in place.
c.
Install upper window frame (289) and side frames (290) with five bolts (285) and washers (286).
289
290
287
286
288
285
287
284
285,286
287
285,286
387-823
283
0228 00-29

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business