Click here to make tpub.com your Home Page

Page Title: ADJUSTMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
BLADE TILT CYLINDER REPLACEMENT - CONTINUED
0209 00
ADJUSTMENT
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in death or injury to
personnel.
NOTE
Tilt cylinder weighs 248 lb (112 kg).
1.
Use a nylon sling and a suitable lifting device to hold tilt cylinder (4) during adjustment.
NOTE
All shims must be removed before adjustment is made. Refer to Removal above.
2.
Measure gap between ball joint socket (11) and bull-
12
dozer blade (12) without shims (12).
10
3.
Remove bolts (10). Install shims (12) equal in thick-
ness to measured gap plus ONE shim. Reinstall bolts.
11
4.
Check blade tilt cylinder for proper operation and
4
leaks (TM 5-2410-237-10).
13
387-703
END OF WORK PACKAGE
0209 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business