Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
BLADE TILT CYLINDER REPLACEMENT - CONTINUED
0209 00
INSTALLATION
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in death or injury to
personnel.
NOTE
Tilt cylinder weighs 248 lb (112 kg).
1.
Attach a nylon sling and a suitable lifting device and sling to center of tilt cylinder (4).
2.
Position tilt cylinder (4) to bulldozer blade (13) and pusharm (16).
3.
Install ball joint socket (11) and tilt cylinder (4) to blade (13) with four bolts (10). Do NOT install shims (12).
NOTE
Push or pull tilt cylinder as needed to line up cylinder with pusharm.
4.
Position tilt cylinder (4) on pusharm (16) and install pin (15) and new cotter pin (14).
5.
Perform Adjustment steps 1-3 to install shims (12) and adjust as required. After performing Adjustment steps 1-3, return
to Installation, step 6.
CAUTION
Wipe all sealing surfaces and hose connections clean and dry before installation. Contamination of hydrau-
lic system could result in premature failure.
NOTE
Lightly coat new O-rings with clean oil before installation.
6.
Install hose (5) with new O-ring (9), two flanges (8), four flatwashers (7) and capscrews (6).
7.
Repeat step 6 for other hose (5).
8.
Install hose guard (3) on tilt cylinder (4) with four new lockwashers (2) and capscrews (1).
9.
Ensure there is enough slack in hoses to permit rod extension.
10.
Check oil level in hydraulic tank. Refill hydraulic tank and bleed air from system, as required (WP 0226 00).
11.
Apply GAA grease to grease fitting on ball joint socket (11).
12.
Start engine and check blade tilt cylinder for correct operation and leaks.
0209 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business