Click here to make tpub.com your Home Page

Page Title: TRACK ROLLER FRAME GUARDS REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
TRACK ROLLER FRAME GUARDS REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
Two
Tool kit, general mechanic's (Item 122, WP 0250
Equipment Condition
Materials/Parts
Machine parked on level ground (TM 5-2410-237-
10)
Compound, antiseize (Item 6, WP 0249 00)
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Failure to follow this warning may result in injury to personnel.
REMOVAL
NOTE
Guard (3) weighs 24 lb (11 kg).
1.
Remove four bolts (1), washers (2) and guard (3) from front end of track roller frame.
NOTE
Guard (6) weighs 52 lb (24 kg). All other guards weigh 20 lb (9 kg) or less.
2.
Remove nine bolts (4), washers (5) and guard (6) from center of track roller frame.
3.
Remove five bolts (7), washers (8) and guard (9) from rear of track roller frame.
4.
Remove four bolts (10), washers (11) and (12) from rear of track roller frame.
3
6
4,5
12
9
1,2
10,11
7,8
387-311

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business