Click here to make tpub.com your Home Page

Page Title: Power Train Pressure Tests - Continued.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
POWER TRAIN HYDRAULIC SYSTEM TESTS - CONTINUED
0122 00
PRESSURE TESTS - CONTINUED
Power Train Pressure Tests - Continued.
PRESSURE MEASURED AT GOVERNOR
CONTROL LEVER
PRESSURE TAP
HIGH IDLE
CORRECTIVE
PRESSURE AT
LOCATION
LOW IDLE SETTING
SETTING
ADJUSTMENT
NONE.
380 psi (2620 kPa)
Brake Boosters
Left Booster (F)
345 psi (2379 kPa)
minimum
and Right Booster
minimum
(brakes activated by
(G)
(brakes activated by
brake pedals)
brake pedals)
NONE.
370 psi (2551 kPa)
330 psi (2275 kPa)
Brake Boosters
Left Booster (F)
minimum
minimum
and Right Booster
(brakes activated by
(G)
(brakes activated by
steering control levers)
steering control levers)
NONE.
370 psi (2551 kPa)
330 psi (2275 kPa)
Piston for Steer-
Left Steering
minimum
minimum
Clutch (H) and
(steering clutches
(steering clutches
Right Steering
released)
released)
Clutch (I)
G
H
I
387-571
F
7.
Install seat and seat base assembly (WP 0172 00).
8.
Install floor plates (WP 0171 00).
9.
Remove track blocks.
10.
Test drive and check for proper operation (TM 5-2410-237-10).
END OF WORK PACKAGE
0122 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business