Click here to make tpub.com your Home Page

Page Title: PRESSURE TESTS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
POWER TRAIN HYDRAULIC SYSTEM TESTS - CONTINUED
0122 00
PRESSURE TESTS - CONTINUED
6.
Refer to Table 1 to perform power train pressure tests.
Power Train Pressure Tests.
PRESSURE MEASURED WITH GOVERNOR
CONTROL LEVER AT:
PRESSURE TAP
HIGH IDLE
ADJUSTMENT
PRESSURE AT
LOCATION
LOW IDLE SETTING
SETTING
Add or remove spacers
415-455 psi (2861-
Sequence Relief
380 psi (2620 kPa)
Pump
to adjust transmission
3137 kPa)
(Pressure Relief
Valve Port (A)
minimum
relief valve (WP 0119
(transmission selector
(transmission selector
Valve)
lever in NEUTRAL)
lever in NEUTRAL)
Add or remove spacers
Torque Converter
Torque Converter
*37-47 psi (255-324
to adjust torque con-
kPa)
Outlet
Outlet Relief Valve
verter outlet relief valve
Port (B)
(transmission selector
lever in THIRD FOR-
WARD and brakes acti-
vated with converter in
stall condition)
B
387-569
A
* Transmission selection THIRD FORWARD = clutches 1 and 4 engaged in transmission.
0122 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business