Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
ENGINE WATER TEMPERATURE GAGE AND SENDING UNIT REPLACEMENT - CONTINUED
0084 00
INSTALLATION
1.
Install new preformed packing (15) on water temperature gage (14).
2.
Place water temperature gage (14) into position through front of dash assembly (5).
3.
Install bracket (13), two washers (12) and nuts (11) on back of water temperature gage (14).
12
13
11
5
15
14
387-147
4.
Place water temperature sending unit (8) down through dash and install grommet (10) into dash assembly (5).
5.
Install water temperature sending unit (8) into cylinder head.
6.
Install three clamps along sending unit line.
7.
Install cover (4) on top of dash assembly (5) with four
5
4
1,2,3
capscrews (1), new lockwashers (3) and washers (2).
8.
Check cooling system (WP 0065 00).
9.
Connect battery cables (WP 0101 00).
10.
Run engine and check for proper operation of gage
(TM 5-2410-237-10).
387-045
END OF WORK PACKAGE
0084 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business