Click here to make tpub.com your Home Page

Page Title: UNIT MAINTENANCE PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) INTRODUCTION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
UNIT MAINTENANCE PREVENTIVE MAINTENANCE CHECKS
AND SERVICES (PMCS) INTRODUCTION
0009 00
GENERAL
1.
To ensure that the D7G Tractor is ready for operation at all times, it must be lubricated and inspected on a regular basis so
that defects may be found before they result in serious damage, equipment failure or injury to personnel.
2.
The KEY in this work package lists the types, amounts and temperature ranges of the lubricants required for specified
intervals.
3.
The Lubrication Chart at the end of this work package shows all Unit Maintenance level lubrication points for the D7G
Tractor.
4.
Table 1 in WP 0010 00 contains systematic instructions on lubrications, inspections, adjustments and corrections to be
performed by Unit Maintenance to keep the D7G Tractor in good operating condition and ready for its primary mission.
5.
For information on Corrosion Prevention and Control (CPC), refer to WP 0001 00.
EXPLANATION OF TABLE ENTRIES
1.
Item Number (Item No.) Column. Numbers in this column are for reference. When completing DA Form 2404 or DA
Form 5988-E, Equipment Inspection and Maintenance Worksheet, include the item number for the check/service
indicating a fault. Item numbers also appear in the order you must perform checks and services for the interval
listed.
NOTE
If both an hours and calender interval are provided, perform check or service at whichever interval comes
first.
2.
Interval Column. This column tells you when you must perform the procedure in the procedure column. Intervals are
based on calender dates or hours.
a.
Hours procedures must be performed at the hour interval specified.
b.
Semiannual procedures must be performed once every six months.
c.
Annual procedures must be performed once each year.
d.
Biennial procedures must be performed once every two years.
3.
Man-Hours Column. This column indicates man-hours required to complete prescribed lubrication service.
4.
Item to Check/Service Column. This column identifies the item to be checked or serviced.
NOTE
The WARNINGs and CAUTIONs appearing in your PMCS table should always be observed. WARNINGs
and CAUTIONs appear before applicable procedures. These WARNINGs and CAUTIONs must be
observed to prevent serious injury to yourself and others or to prevent your equipment from being dam-
aged.
5.
Procedure Column. This column gives the procedure you must perform to check or service the item listed in the Item
to Check/Service column, to know if the equipment is ready or available for its intended mission or for operation. You
must perform the procedure at the time stated in the interval column.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business