Click here to make tpub.com your Home Page

Page Title: MAIN (BULLDOZER) CONTROL VALVE REMOVAL - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-233-23
MAIN (BULLDOZER) CONTROL VALVE, RIPPER CONTROL VALVE
AND RELIEF VALVE REPLACEMENT - CONTINUED
0151 00
MAIN (BULLDOZER) CONTROL VALVE REMOVAL - CONTINUED
10.
Remove three bolts (21), lockwashers (22), pump suc-
29
25,26,27
28
tion tube (23) and gasket (24) from bottom plate (8).
31
(HIDDEN)
Discard lockwashers and gasket.
23
11.
Remove two bolts (25) and lockwashers (26) from end
caps (27) of oil line (28) between main (bulldozer)
control valve (29) and ripper control valve (30). Dis-
30
card lockwashers.
12.
Remove oil line (28) with end caps (27) and gaskets
8
(31). Discard gaskets.
386-738
21,22,24
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may result in injury or death to
personnel.
NOTE
Main (bulldozer) control valve weighs approximately 75 lb (32 kg).
13.
Remove two bolts (32), lockwashers (33) and main
8
(bulldozer) control valve (29) from bottom plate (8).
Discard lockwashers.
386-739
32,33
0151 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business